Direct answer
Shippers pricing CMA CGM moves from South China to named African destinations should confirm whether the $400-per-TEU Peak Season Surcharge applies and is already included in the ocean quote. Origin and destination matter, and a separate China-origin schedule starts later. The next decision is an all-in booking comparison, not adding the headline amount to every Asia–Africa shipment.
Which lanes and dates are actually covered?
CMA CGM’s November 4 notice lists $400/TEU from South China to Dar es Salaam and Mombasa from November 10; North and Central China follow November 15. The notice says the China PSS is subject to filing and/or inclusion in ocean freight. A separate November 5 notice applies $400/TEU from South China to Mozambique, all cargo, from the November 10 loading date.
Keep the two notices distinct. Dar es Salaam and Mombasa have an origin-specific application table. The Mozambique advisory expressly uses loading date. Do not import that timing definition into the other notice without confirming the booking’s governing rule.
The reviewed Dar es Salaam and Mombasa table does not provide a detailed equipment or cargo-type breakdown. Ask the carrier to confirm applicability for the intended equipment and shipment. An absence of detail is not permission to invent an exemption or describe every equipment type as expressly verified.
How can a buyer avoid double-counting the surcharge?
SCS analysis: request a written quote showing whether PSS is a separate line or part of ocean freight. This matters because the China-to-Dar es Salaam/Mombasa advisory explicitly allows inclusion in the freight amount. Adding another $400/TEU to an inclusive quote could overstate the payable cost.
Retain the billing unit. A TEU is a twenty-foot equivalent unit, so ask how the carrier bills the booked equipment rather than treating the announcement as $400 per physical box. Reconcile the quoted quantity and unit with the carrier’s confirmation before updating the budget.
The notices also identify other potentially applicable charges. Compare base freight, fuel-related items, terminal handling, security and local charges on the same basis. A headline PSS does not describe the entire origin-to-destination bill or establish the percentage increase in total cost.
What should the booking and contract review cover?
Check origin classification, destination, cargo, equipment, rate validity and the effective-date trigger. For a booking close to an application date, ask what happens if the planned loading or sailing changes. Keep written confirmation with the accepted quote.
Review whether a forwarder may pass through a newly applicable surcharge and how inclusive prices are documented. Confirm the scope of destination services and exclusions as well. A comparison between two carriers is unreliable when one includes charges that the other lists separately.
What would justify changing the shipment plan?
Compare current all-in offers for the same shipment and required arrival window. Include any cost of delaying goods, changing the origin gateway or reworking the inland leg. A lower ocean charge can be outweighed by additional handling, inventory delay or a missed customer commitment.
Revisit the decision when the carrier confirms a different applicability date, updates the notice or provides a materially better complete offer. Until then, budget the confirmed amount only for the affected movement. Neither notice establishes an industrywide Africa surcharge or a change in every carrier’s rates.
Three checks before your next decision
- Match the actual origin, destination, cargo and equipment to the correct notice.
- Confirm the date trigger and whether PSS is already included in the ocean quote.
- Compare complete shipment costs and delivery requirements before changing the booking.
Frequently asked questions
Does the November 10 date cover all China origins?
No. The Dar es Salaam/Mombasa table gives North and Central China a November 15 application date.
Should $400/TEU always be added to the quoted freight?
No. Confirm inclusion first; the China-to-Dar es Salaam/Mombasa advisory says PSS may be included in ocean freight.
Is Mozambique covered by the same notice?
No. A separate advisory covers South China to Mozambique and explicitly uses the November 10 loading date.
Original November 10 coverage prepared under the requested Protocol 01: Impact. Reported developments, conditional commercial exposure and SCS analysis remain distinct.
Sources & publication notes
Primary carrier advisories directly read November 10, 2026. Exact scopes, units, effective dates and inclusion caveats are preserved. The notices establish published charges, not the amount owed under every customer agreement. SCS comparisons are conditional analysis, not guaranteed savings or advice to alter a booking without confirmation.
- CMA CGM: China to Dar es Salaam and Mombasa PSS ↗4 November 2026; application dates 10 and 15 November · Primary page directly opened: origin-specific $400/TEU dates, filing/inclusion caveat and other possible charges. No detailed equipment breakdown stated.
- CMA CGM: South China to Mozambique PSS ↗5 November 2026; effective loading date 10 November · Primary page directly opened: South China to Mozambique, all cargo, $400/TEU, November 10 loading date until further notice.
SCS publication: 10 Nov 2026 · 13:12 UTC. Last modified: 10 Nov 2026. Research cutoff: 10 November 2026, 12:55 UTC / 4:55 a.m. PST; dated source observations, not a live feed; not the publication time. Source dates are distinct from publication. Reported figures remain attributed, not independently audited. External source availability may vary.
Prepared with AI-assisted research and analysis at the site owner’s request. A separate human editorial review is not recorded. Reported figures remain attributed to their sources.
Use your own evidence.
Related reporting: Ocean Freight Rates: Compare Drewry and Freightos October Updates ↗ — Compare the planning question while preserving its distinct event, source dates and evidence.
Compare complete shipment costs ↗ — Use your own contracted amounts, service requirements and documented assumptions.
Tools remain separate from the reporting. No headline becomes a live quote, a guaranteed saving or an automatic surcharge.



